The four Circle Drive bridges spanning Fountain Creek, BNSF tracks, Hancock Expressway, and Las Vegas Street were deteriorating and required immediate attention. Benesch provided a detailed field inspection of the existing conditions and developed a program to address immediate repairs, methods for future repairs, and maintenance strategies. Following program development, the City selected Benesch to provide construction engineering services and assist with construction management on this Federally Funded repair project with CDOT oversight. A major role was assessing actual field conditions during repairs and making changes to the design based on findings. Benesch performed wage rate interviews and verified EEO compliance in accordance with FHWA and CDOT practices.
City of Colorado Springs
Circle Drive Bridges
Colorado Springs, CO

Project highlights
- Multiple agency oversight and coordination
- Federal funding
- EEO compliance